AIR LIQUIDE DUAL 14" , PORTLAND TX

November 2020

Take a look at this dual 14" project we took part of in Portland TX, The Crew on our 500x500 HRE ( Vermeer ) had great success on this one, with no incident or delay. Great job 500 crew!

Owner: Air Liquide

Contractor: Hollico General Contractors

Length: 2750 linear feet

Get in Touch
dual pull.jpg

CORPUS CHRISTI SHIP CHANNEL 20" WATERLINE REPLACEMENT, PORT ARANSAS TX

November 2021

Check out the Pull our Million lb crew completed under the Corpus Christi Ship Channel! With the Port of CC needing existing utilities lowered for dredging, Isaacks was there to answer the call and get the job done. These men and women worked without incident nor did they waste any time getting this pull completed. Great job Million Lb crew!


Owner: Nueces County Water

Contractor: Austin Engineering Company

Length: 3600 Linear Feet 

Get in Touch
pocc 20.jpg

FLINT HILLS PIPELINE, 16" REPLACEMENT

August-September 2022

August of 2022 we started a project with Flint Hills and Storm Services relocating a 16" refined products line in Taylor TX. We completed a series of HDDs and road bores on this project in a safe and timely manor. As always we are pleased to be able to provide this service for our customers!


Owner: Flint Hills Resources

Contractor: Storm Field Services

Lengths: 150'-2000'

Get in Touch
IMG_0177.jpg

AIR LIQUIDE 12" VIOLA CHANNEL LINE LOWERING

December 2022

IDD's HRE 500 crew tackled this line lowering project for Air liquide utilizing a Inrock motor and Brownline Gyro steering system. The line lowering was done at a depth of 210' under the channel for future drfedging of the channel to accomodate larger ships into the Port of Corpus Christi!
Owner: Air Liquide 
Contractor: Hollico General Contractors
length: 3100 LF

Get in Touch
IMG_0503.jpg

PACKERY CHANNEL 20" FPVC WATERLINE REPLACEMENT

January 2023

Battling cold fronts, extremely sandy soils and other grueling conditions, our crews prevailed in pulling a 20" fusible PVC waterline for the City of Corpus Christi under Packery Channel on Padre Island. Due to unavailable space on the exit side the Pipe had a mid-fuse. the pullback went smoothly congrats 500 crew!
Owner: City of Corpus Christi
Contractor: Bridges Specialties
length: 2500 LF

Get in Touch
IMG_0957_edited.jpg

AEP PACKERY CHANNEL FIBER LOWERING

January 2023

The 100x140 crew helped install a 4" duct under Packery channel and some wetlands in a series of HDDs to lower an existing fiber optic cable off overhead poles to an underground application. The Channel crossing being 1500 LF and two shorter wetland bores 500 feet each. Our crew pulled the ducts in with ease in the beach sand on the edge of the Gulf of Mexico. Great job guys!
Owner: AEP
Contractor: Tracker Services
Length: 500-1500 LF

Get in Touch
IMG_1898_edited.jpg

INSTALLATION 18" HDPE DRAIN INSTALATION

January 2023

our 100X140 crew installed two 18" HDPE pipes on grade over 800 LF to help Cheniere with drainage at their LNG facility in Portland TX. Job well done !
Owner: Cheniere
Contractor: Sunland Construction
Length: 800 LF

Get in Touch
IMG_1939.HEIC

NEW DEVELOPMENT FORCE MAIN 6"

February 2023

Our crew installed 1800 feet of 6" force main sewer  for a new housing development in Rockport, TX. The job spec was abnormal, requiring IDD to bore 5 feet under a stretch of road for 3/4 of the bore. Then make a dive under a road to 10' before coming back to the surface. The bore was completed with no damage to the road and a happy customer was made! 

Owner: City of Rockport

Contractor: Big Chief 

1800 LF

Get in Touch
IMG_0990.jpg

PHILLIPS 66 FLNG 16" FREEPORT TX

April-May

Our 100x140 crew prevailed in Freeport pulling in a total of 2200 LF in 4 different HDDs and road bores on a short spread connecting two facilities with a new 16" LNG line. 
Owner: Phillips 66
Contractor: Sunland Construction
Length 200 - 800 LF

Get in Touch
IMG_1791_edited.jpg

BOCA CHICA ELECTRICAL CASING 24"

June 2023

We had the oppurtunity to send our Auger Machine down to the Rio Grande Valley at Space X Starbase to install 60' of 24" steel casing underneath the Boca Chica Highway for electrical conduits to be ran inside them. Conditions werent ideal being below the water table, but, IDD made the push and got the job done. 
Owner: Space X
Contractor: DC Energy
60 LF

Get in Touch
IMG_1736.jpg

30” GUIDED AUGER BORE GEISMAR, LA

October 2023 Owner : Air Liquide 

We had a fun and land complex out in Louisiana, drilling a pilot with our 100x140 Vermeer HDD machine, then using that pilot to push in 270 LF of 30” steel casing. Great job crew!

Call for a quote today!